the Radcliff project in 2005 Sunbelt Construction was
contacted by the Westchase community to renovate their
existing bridge structure. This project involved the
demolition of the existing bridge structure leaving only the
piles and stringers remaining. From this point Sunbelt was
able to design a new timber bridge structure utilizing
alternate timber composite materials to create a more modern
appeal. Sunbelt’s design team worked closely with the client
to incorporate two new platforms within the old bridge
structure. This project was one of three phases to be
completed and was done within budget.
|