|
Projects: Timber Docks & Piers
Glencliff, Timber
Boardwalk
In
addition to the new bridge structure for the community of
Westchase, Sunbelt Construction was contracted to renovate
their existing timber boardwalk. This involved the
demolition of existing boardwalk leaving only the piles and
stringers. Through Sunbelt’s design/build process the
boardwalk was rebuilt using alternate timber composite
materials. A total of 740 linear feet of boardwalk was
constructed with this alternate timber composite material.
This renovation brought the reconditioned boardwalk within
compliance of ADA requirements. This was the second of three
phases and was completed on time and within budget.
|