Case
Study #1, Timber Construction at Big Cypress Basin
- Project location is Federal Indian Reservation that
contained a large variety of wild life. Environmental
protection of the land and safety of the wild life
mandated engineered designs and construction techniques
that far exceeded previous capabilities of the company.
Case
Study #2, Timber Construction at Peterson Park
- Project location offered extreme elevation challenges
with terrain that was dredged fill dirt piled in hills
with absolutely no flat areas throughout boardwalk path.
Polk county officials recognized the many construction
difficulties and required mandatory pre-bid meeting and
site visit by all interested Construction Company’s.
Case Study #3, Timber
Construction at Meadow Point, Phase II
- Project located in large Master Planned
residential development community with strict
environmental standards. Permitting for the project
exceeded 7 months after meeting requirements from three
regulatory agencies.